Tuesday, 18 December 2012


The link to the
MAIN WEBSITE OF THE RUS104 2012.


http://www.hbp.usm.my/rus1042012/main.html





Monday, 17 December 2012

Summary of RUS104 SEMESTER 1

          Forth months ago, I went from a high school student to a  APEX University student.I got my first choice of University and Course that i want. Even though we were very busy until not enough sleeping to rush studio project, but we enjoyed our life in hbp. Time flies very fast, we had reached the end of semester. I had learn many things in RUS104 studio, not only for academic but also I learn to be more confidence,leadership, spirit of unite,friendship and many more.I will never regret and PROUD TO BE A HBP STUDENT.

PROJECT 10 : EXHIBITION

RUS 104 XZHIBITION 2012


To share out our studio work to largest community of HBP,we have to exhibit our outcomes from project 1 to project 9 at The Drum of School of HBP.

We were divided into 6 different groups to decorate 5 exhibition booth and 1 group for special task.The theme of exhibition are "COLOURFUL DOMINO".We group 3 combined with group 8 to decorate exhibiton of Sculpture and Blueprint.


Process of decoration~~




Doing different sizes of boxes with cardboard to place the sculpture.


Our booth special trademark

On the exhibition day~~














Thank You

PROJECT 9 : INTEGRATED PROJECT


PROJECT 9A :
Design Proposal – Batu Ferringhi Information Centre


Board 1 : Site Analysis Information,Key plan and Site Plan




Board 2 &3 : Conceptual Sketches & Bubble Diagram (Design Concept)




Board 4 : Materials Selection & Building Services



PROJECT 9B:
Development Proposal

In this part of project, we divided work according to our major.Since I'm a QS students, I am incharge of doing Elemental Cost Analysis.

ECA


Type and Quantity of Materials

PROJECT 9C:
CONCEPTUAL MODEL



Process of making model

Our project during exhibition


Prensentation












Sunday, 16 December 2012

PROJECT 8 : (RE)VISITED


 For this project, we have to analysed the site of batu ferringi based on climate,facilities,tourism related economy,a strategy place to locate a information centre and etc.We have to go for site visit early in the morning.

Depart from HBP Usm....

We have to take a lots of photos






Went back Usm at night....

After 2 weeks, our project done~


 Project 8A : Community Facilities & Tourism Activities



Project 8B : Environment and Spatial Analysis

HBP Group 3 GO GO GO!!






PROJECT 7 : INTERLINKED


In this project, we QS students were divided into 4 group with 6 person per group. I were in group 1 with Bao Yun, Adam, Shiau Fen,Muniral and Ameerah. We divided into 2 groups for this project.We analysed the area of HBP by site visiting and advice from lecturer.We also obtain many data or information from research.

Project 7A : Analysis of HBP Space




Project 7B : Blueprint of skyway that our designed.



PROJECT 7C: SKYWAY STRUCTURAL MODEL

Process of making model~~~



Venue : Tekun Cafe



Our final model of skyway~~

Front View

Isometric View

Back view

Plan view







PROJECT 6 : PROJECT DEVELOPMENT




Project 6 required us to analysed the role of all major in building construction based on RIBA(Royal Institude of British Architects 2007) using a mindmaping. I decided to do the role of QS(quantity surveyor) because that's was my ideal career in future.


There are 5 stages in construction- Preparation,Design,Pre-Construction,Construction and Use.There are futher 12 sub-stages in a constrution. I obtained the information from internet and my studio master, Dr.Mastura.

My completed mindmap


From this project, I had knew more details about the role of a QS. And also I felt that I have made a correct  choice of be a QS students.